Search
As one of Heilongjiang's key projects, the second phase of the Muling North Semiconductor Technology Co. , Ltd. was put into operation at the beginning of the spring festival, in the year of the Rabbit, the first order signed with foreign enterprises amounted to 380 million yuan. As a private technology company, northern half is Heilongjiang's first chip company. The main IGBT semiconductor module is the core device to realize the electric energy conversion, transmission and control in the electric equipment, which can be said to be the“Heart” of the electric and electronic equipment, it can be widely used in electric power, consumer electronics, automotive electronics, new energy and other traditional and emerging fields. In the past, Heilongjiang was unable to produce such digital products. Now, with the launch of North Half Semiconductor, IGBT semiconductor device products have emerged. The company is leading the IGBT semiconductor module industry base project, it has been incorporated into Heilongjiang's 14th five-year plan for the development of the digital economy. According to reports, the north half semiconductor project has a total investment of 430 million yuan, divided into two phases of construction. The first phase of the project has a total investment of 80 million yuan and a clean workshop of 1,800 square meters. It was put into production in September 2018. The main products are 34mm, 48mm and 62mm MIGBT modules, which are widely used in the field of industrial control The second phase of the project is a key project in Heilongjiang, with a total investment of 350 million yuan to build a clean workshop of 8,000 square meters. The new 5 modern production lines, so that the enterprise's production scale has been greatly increased. It is understood that north first semiconductor to build high-end digital exhibition hall, the introduction of domestic and foreign advanced manufacturing equipment to produce IGBT, PIM, IPM, HPD and other modules and IGBT back-end chips, plans to 2023 in June to achieve mass production. At present, enterprises and 18 domestic and foreign merchants signed supply contracts, production orders have been scheduled to 2024 May. (Zhang Zhongwen)